Degreased the transom where the old 2 stroke shat back there. Cleaned up the inside and then took the wheel and roughed up the gel coat on the inside of the transom so I can get a better bond with my tabbing.
Bout to head to town for some tack cloth and acetone. Also gona grab some mixing cups that won't melt and some brushes and rollers. Hoping to at least have the floor sealed on the back, glued down and tabbed in by weekends end....

If I get the entire floor project done I probably deserve a medal.